Within many organisations, there will be trades that may require work away from their premises. This may be a simple completion of a delivery of goods, where time spent at a third-party premises is brief, or it could be work that involves complex and large mechanical installation operations taking many months or even years.
Work away can routinely involve both low and/or high-risk activities, and these risks need to be managed properly.
The following list provides examples of trades where the third-party damage and injury risks from activities undertaken away from own premises need consideration.
These can range from minor damage to a wall or gate during delivery, to the total loss of an entire premises by fire.
It is important to recognise that there may also be potential that the third party will suffer a consequential loss as a result of any damage caused. Major risk exposures are likely to include:
There is a range of personnel whose safety can be put at risk by work away, including the employees undertaking the work away activities, other contractors working at the site, those employed directly at the site by the customer and/or any visitors or passers-by.
It is worth looking at what significant hazards are likely to be applicable and in what circumstances there might be third-party damage or injury to own employees or other personnel on or around the site.
Hot work is a leading cause of industrial fires, consistently listed in the top five causes across all industries, and it has been responsible for many of the industry’s most severe fire losses.
Any hot work that is carried out at third-party premises must be the subject of formal procedures, specifically a Hot Work Permit System, but also Risk Assessment and the preparation of a Method Statement (or Safe System of Work).
There are a number of factors that can affect the risk and extent of potential injury or damage whilst undertaking work away. These may include:
Volume of Work Away
Companies undertaking a large amount of work away will face a greater exposure to hazards due to the volume of hours spent at customer’s premises.
The Work Undertaken and its Duration
The extent of contact between the organisation completing the work and the third party (either property or personnel) is critical. For example, delivery of goods that do not require entry to premises will be classed as low risk, whereas work internally to the third-party buildings or plant will be classed as higher risk.
The Use of the Premises
There will be varying levels of risk dependent on the use of the premises. For example, work at a petrochemical site would have the capacity for significant property damage, pollution and injury.
Type of Premises
The cost of reinstatement or repair of a basic industrial unit would be low compared to a building of more complexity, for example, an historic listed building.
Location
A quiet industrial estate or rural location will have fewer passers-by who could potentially be affected by work, whereas works in a city centre location are likely to have a high density of pedestrians in the immediate vicinity.
Also, works in populated areas known to have a claims culture may be more likely to attract allegations of injury/ illness from work in those areas.
Complexity of Machinery or Equipment
Often parts of a customer’s machinery will require to remain powered or continue running during works and this can present significant safety hazards.
Susceptibility to Damage
Machinery, equipment or stock held on site may be particularly susceptible to smoke, water or physical damage. Often what is perceived as minor damage may not be repairable resulting in expensive machinery, equipment or stock having to be written off.
Potential for Consequential Loss
The potential for consequential loss following injury or damage will often be closely linked to the usage of the third-party premises. For example, minor damage to a critical item of machinery such as a large printing press or a woodworker’s dust extraction system could cause production to cease until repairs are completed, resulting in a much larger consequential loss than the actual cost to repair the damage.
Extent and Quality of Health and Safety Management
If health and safety (H&S) are poorly controlled at the third-party premises, then this can increase the risk of injury caused by the work being undertaken. This can affect the employees undertaking the work away, other contractors on-site, third-party employees or anyone else in the vicinity, such as visitors or passers-by.
Managing the Risks Associated with Work Away
The risks associated with work away can be mitigated through the use of an effective management system. This will assist the party undertaking the work to identify problem areas and then manage these, and will likely include:
Contractual Agreement
The absence of written contracts and agreements between all parties involved can lead to confusion and dispute should something go wrong. They should cover the scope of the work, responsibilities of each party, liability issues, evaluation of risks and related safety controls.
A Risk Assessment Process
As with any risk assessment, the detail and complexity required will reflect the hazards and the complexity of the work. Generic risk assessment documents may be appropriate for low-risk work at low-risk premises but should include the facility for additional assessment of any unusual hazards that may be encountered.
Work involving high-risk premises or activities will require bespoke risk assessments. These may include a pre-work site visit and site assessment, as well as communication with, and the involvement of the customer’s H&S team. It should cover the risks to everyone who may be affected by the works and could include passers-by not specifically involved in the activity. For example, the risk of falling objects from scaffolding beside a pavement.
Plan and Document a Safe Method of Work
For low-risk activities that are continually repeated at different sites, generic method statements may be appropriate but should also provide information to the operative to stop work should certain unforeseen hazards present themselves. High-risk premises/activities should have detailed method statements (sometimes known as safe systems of work) as well as any other safe systems of work particular to the hazards likely to be encountered. These could include permit to work systems for activities such as hot works, confined space entry, excavation, high-voltage electrical work or pipeline breaking. Often the customer’s H&S team will be required to approve these documents prior to the work commencing. These Risk Assessment and Method Statement documents are often referred to as “RAMS”.
Training and Competence
An appropriate level of training/competence is important for all that are involved in undertaking the task. This not only relates to operatives, but can also involve managers, supervisors or others, such as temporary staff. An assessment should be undertaken to ensure they have the necessary skills.
Training can be in-house or through external training providers and should be relevant to the work, for example IPAF (for operators of mobile elevated work platforms), PASMA (for users of mobile access towers), WAMITAB (Waste Management Industry Training), asbestos, manual handling, HAVs (vibrating tools), working at height, supervisor training, Institute of Occupational Safety and Health (IOSH) Managing Safely or National Examination Board in Occupational Safety and Health (NEBOSH). Site supervisors and site managers may benefit from specific courses targeted at site safety, such as Site Supervisors Safety Training Scheme (SSSTS) or Site Managers Safety Training Scheme (SMSTS) provided by the Construction Industry Training Board (CITB) or the appropriate NEBOSH general certificate.
Some training may be generic for all operatives on site, such as Site Safety Training or Manual Handling Training whereas some activities will require to be undertaken by personnel with specific training or accreditation due to the inherently hazardous nature of the work involved. Examples of this could include;
Regular reviews are important to ensure that all persons involved in work away retain the appropriate levels of skill and competence. Re-training and refresher training should be undertaken where appropriate as this should pick up any changes to activities as well as incorporate any new developments in safety practice. However, clear instructions are required to make sure personnel do not try to undertake activities which are outside of their skill set. Responsibility for safety lies with everyone on site managers, supervisors and operatives.
Important information to assess the Work Away risk exposure:
This article is provided by our insurer partner, Arch and is written by Arch Insurance Risk Managers and/or surveyors and has not been verified for accuracy by a third party. This article is for general guidance only and aims to provide general information on a relevant topic in a concise form. None of the information should be taken as legal or professional advice and we recommend that for further information, you should speak to an expert in this field.
Date: July 31, 2023